The case

What is harder on a buried pipeline: the train, or building the track? The train, on firm ground with 2 m of cover: 8 mm/s of vibration and negligible fatigue damage over 50 years. Construction: with 0.9 m of cover a vibratory roller sends 60 mm/s to the pipe, and raising the embankment on soft soil settles the ground 12 cm and bends the pipe to 117 MPa.

Topics

  • Pipeline crossings
  • Settlement
  • Narrated explainer

Basis. Generic synthetic case built for this piece. No client data. Not a design verification.